Wednesday, December 21, 2005

Naked Stix 2006 update

Naked Stix

How am I doing on my list?

Three Garter Stitch Scarves done, one more scarf coming along (mistaken rib, I got tired of garter stitch), the Striped Pullover and the Escher bag are done, Ruffles was moved to the "not-going-to-be-done" in 2005 list with NBaT and Hopeful, the First Cables Sweater needs only the collar and the making, 10 inches done of the Pink Poncho, toe done of the second Little Cables Sock, and the wrong pattern is having a well deserved time out.

I'd love to write more, but I have knitting to do.